產(chǎn)品簡介ⅠDescription

山維鴻遠(yuǎn)K11柔韌型防水涂料是以優(yōu)質(zhì)丙烯酸酯乳液和多種添加劑組成的有機(jī)液料,并以特種水泥及多種填充料組成的無機(jī)粉料,經(jīng)一定比例配制成的雙組份水性防水涂料。涂刷于基體表面,固化后可形成柔韌、高強(qiáng)的防水涂膜。適用于衛(wèi)生間、廚房、陽臺、樓地面、水池、地下室的防水、防潮。

Shanwei Hongyuan K11 flexible waterproof coating is based on high-quality acrylic emulsion and a variety of additives consisting of organic Liquid materials, and special cement and a variety of filler material composed of inorganic powder,a certain percentage of the preparation of the two-componentWater - based waterproof coating. Brush on the substrate surface, after curing can form a
flexible, high-strength waterproof coating. Applicable to   Bathroom, kitchen, balcony, floor, floor, pool, basement waterproof, moisture-proof.

注意事項ⅠPrecautions

●施工時氣溫應(yīng)在5℃-35℃之間,大風(fēng)或雨雪天室外禁止施工;

●配制好的涂料應(yīng)在1小時內(nèi)完全使用完畢,使用過程中嚴(yán)禁加水;

●開封后未使用完的液料或粉料,應(yīng)密封貯存;

●施工過程中注意保護(hù)防水涂膜不受破壞。

● Preparation of a good paint should be completed within 1 hour after the completion of the use of the process is strictlyprohibited water;

● configured paint should be fully used within 1 hour is completed, the use of  water is strictly prohibited during the process;

● After unsealing, unused liquid or powder material should be sealed and stored.

● During the construction, pay attention to protect the waterproof coating from damage.

配比及用量ⅠRatio and Coverage

液料:粉料=10:25(重量比);1mm厚的涂膜約需涂料2kg/m2

Liquid material: powder = 10: 25 (weight ratio); 1mm thick film about 2kg / m2

施工要點(diǎn)ⅠApplication Instruction

●清理基層至平整、堅實;

●一袋液料配一袋粉料,先將液料倒入攪拌桶中,在攪拌的同時緩緩加入粉料,用電動攪拌器攪拌至均勻、無結(jié)塊;

●先將基層潤濕飽和但無明水,防水涂膜宜涂刷兩至三遍,每遍涂膜干燥后方可進(jìn)行下道工序,時間間隔4-6小時。待涂膜完全干燥后,方可進(jìn)行閉水試驗;

●防水層涂膜厚度宜1.5-2.0mm;施工時宜采用“十”字交叉涂刷的方式。

● clean up the grassroots level to a solid, solid;

● a bag of liquid with a bag of powder, the first liquid into the mixing tank, while stirring slowly adding powder, Stir with an electric stirrer to uniform, without  agglomeration;

● first base wetting saturated but no water, waterproof coating should be painted two to three times, each time the coating is dry before The next process, the time interval of 4-6 hours. Until the coating is completely dry before the closed water test;

● waterproof layer coating thickness should be 1.5-2.0mm; construction should use "ten" word cross brushing way.

產(chǎn)品貯存ⅠStorage

存放于陰涼干燥處;在5℃-35℃正常運(yùn)輸條件下,未啟封產(chǎn)品保質(zhì)期為12個月。

Store in a cool dry place; in 5 ℃ -35 ℃ under normal transport

conditions, nopened product shelf life of 12 months.

執(zhí)行標(biāo)準(zhǔn)ⅠProduct standard

GB/T23445-2009《聚合物水泥防水涂料》

GB/T23445-2009 "Polymer cement waterproof coating"

生產(chǎn)日期和批號ⅠProduction  date and Batch number